Home > Forum Home > Excel Portfolio Optimization Template > 2600 Systems | Share |
Forum Topic | Post Reply Login |
2600 Systems | Rate this: (3/5 from 1 vote) |
![]() | We have 2600 Systems which are tracked. We want to Optimize their worth through your program. Question, is it possible to do such a large number? These are all 'non-profit' generating, ie. Government Systems. | |
Posted by adragton@hotmail.com on |
Replies - Displaying 1 to 1 of 1 | Order Replies By: Most recent | Chronological | Highest Rated |
![]() | Rate this: (4/5 from 2 votes) There is a workaround, whereby assets (or systems) are first categorized into groups. Each group needs to have 100 or less assets and is optimized individually. The index values of each group is then used to optimized the portfolio groups. The individual assets within each group can then be allocated an optimized weighting by multiplying its group weighting by the individual asset weighting. This approach can also be useful for analyzing the category group optimized weightings for higher level decision making (such as business unit capital allocation). |
Excel Business Forums Administrator | |
Posted by Excel Helper on |
Displaying page 1 of 1 |
Find relevant Excel templates and add-ins for 2600 Systems in the Excel Business Solutions Directory |